You don't have javascript enabled. Good luck with that.
Pencarian
Stasiun MRT Jakarta Dipastikan Aman dari Banjir
.
photo Wuri Setyaningsih - Beritajakarta.id

MRT: Jakarta MRT Stations are Safe From Flooding

PT. MRT Jakarta ensures subway line will be safe from flood during rainy season.

Kami antisipasi dengan meninggikan pintu masuk setinggi 1,5 meter dari permukaan jalan. Jadi itu sudah cukup aman

PT. MRT Jakarta Construction Director, Silvia Halim explained, his side has researched the flood history in Jakarta before her side started this rail-based rapid train construction.

"We have anticipated it early by elevating the entrance gate as high as 1.5 metes from road surface. So, it is quite safe," she said during monthly meeting with the media at Wisma Nusantara, Thursday (12/19).

MRT Extends Operational Hour for New Year's Eve

According to her, MRT has waterproof panel technology which is installed in every underground station entrance thus water can't get into the station.

"This technology can be activated during rainy season in Jakarta and de-activated it when rainy season has ended. We also have water level sensor in Krukut River and West Flood Canal. Those panels are connected directly to OCC in Lebak Bulus," she stated.

Moreover, her side also provided water storage ponds in the station with size 4x4 meters and depth of 2 meters. Each of the pond has pump with capacity 25 liters per second.

"We also have four dikes as high as 50 mm divider around the transition track pads to ensure water to flow on the  waterways provided. Connection between parapet on the nearest pier from the underground station is also equipped with sealant. With all of these prevention actions, we can ensure MRT lane is safe," she asserted.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye350 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye315 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik